En-suite installation in Hall Green

Midlands HMO designs and builds HMO en-suite installation schemes in Hall Green, with room sizes, fire protection and shared facilities worked out before any walls go up.

Whether the house in Hall Green is empty, let or mid-purchase, we can start with the survey.

  • Free survey and fixed written quote
  • Covering Hall Green and nearby West Midlands towns
  • Quotes itemised so you can compare

Book a survey in Hall Green

Tell us about the property. We reply within one working day.

Birmingham City Council is the licensing and planning authority for Hall Green. We check its rules for the exact street before we draw a single partition.

We can keep a photographic record of each stage, which is useful evidence when the council inspects or a buyer's surveyor asks questions later.

HMO rules in Birmingham City Council

RuleBirmingham City Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingIn force
Whole city, 5 June 2023 to 4 June 2028
Selective licensingIn part of the area
25 of the city's 69 wards, 5 June 2023 to 4 June 2028
Article 4 direction for small HMOsIn force
Whole city, in force since 8 June 2020

Checked October 2026 against Birmingham City Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Birmingham City Council has an Article 4 direction across its whole area, so turning a family house in Hall Green into a small HMO needs planning permission. We prepare the planning application before any conversion work starts. Seven or more occupants always needs planning permission. Birmingham City Council also runs additional licensing across its whole area (until 4 June 2028), so smaller HMOs with three or four people from two or more households need a licence too.

How we handle HMO en-suite installation work in Hall Green

We fit en-suite shower rooms in HMO bedrooms across Hall Green, starting with a check that each bedroom still meets its size standard once the en-suite is built. Councils take different views on whether en-suite floor area counts, so we confirm the local position first.

Older houses often have joists running the wrong way and soil stacks in fixed positions, so in Hall Green we check the drainage route under the floor before quoting. Every en-suite we fit in the West Midlands is finished with a ducted fan, certified electrics and fire stopping.

  • Drainage route checked under the floor at survey
  • Bedroom measured to confirm it still meets size standards
  • Shower, toilet, basin and wipe-clean wall finish fitted
  • Electrical work tested and certified
  • Extract fan ducted to outside with overrun control

En-suite installation near Hall Green

En-suite installation in Hall Green: common questions

How long does an HMO conversion in Hall Green take?

It depends on the size of the house and the work involved. Your written quote includes a programme for each stage, and any planning or licensing time is shown separately.

Do you handle building regulations for conversions in Hall Green?

Yes. An HMO conversion often involves building regulations work such as fire protection, new partitions and drainage, and we arrange approval and inspections with local authority building control or a registered building control approver.

Do I need planning permission to convert a house to an HMO in Hall Green?

It depends on the number of occupants and whether Birmingham City Council has an Article 4 direction covering the address. Seven or more occupants always needs planning permission. We check the position for your street before quoting.

Do you supply fire doors and alarms as part of a conversion?

Yes. Fire doors, the alarm system and emergency lighting are specified to the fire risk of the house and included in the price, not added later.

Planning an HMO in Hall Green?

Send us the address and we'll check the licensing and planning position before we talk about prices.

Call free Guide price