Turnkey HMO projects

A turnkey HMO project is one contract that takes a house from purchase support to a licensed, furnished and let shared home. We handle the appraisal, design, planning, build, licensing, furnishing and first tenants, with optional management afterwards. You keep control of the purchase and finance decisions, and approve each stage before the next one starts.

Running an HMO project yourself means coordinating a surveyor, designer, planning consultant, builder, certificate engineers, the council and a letting agent, each with their own timetable. A turnkey project puts that under one contract with us, with the work carried out by our team and vetted subcontractors working under us. The project is broken into stages with clear decision points, so you see the findings and costs before committing to the next step.

  • Written terms for each property
  • Covering all 12 Midlands counties
  • Build, compliance and lettings in one team

Get a guide price

Book a free survey

Tell us about the property. We reply within one working day.

Finished HMO bedroom suite with a feature fireplace and en-suite shower room

What are the stages of a turnkey HMO project?

  • Purchase support and appraisal. We assess the house before you buy: room count, planning route, licensing position, fire and building regulations implications and a guide build cost.
  • Design. Measured drawings and a layout designed around room sizes, amenity standards and fire safety.
  • Planning and building control. A planning application or lawful development certificate where needed, and building regulations approval where the work requires it.
  • Build. Conversion works to a fixed written quote and programme, with certificates at handover.
  • Licensing. The licence application prepared and submitted where the house needs one.
  • Furnishing and first tenants. Rooms furnished, advertised, referenced and let.
  • Optional management. Ongoing HMO management if you want it.

You can stop after any stage. Each one ends with a written summary and a decision for you, and you can see the design and build side in more detail on our HMO conversions page.

Which decisions stay with me?

The decisions that carry financial risk stay with you. You choose whether to buy, what to offer, how to fund the purchase and the works, and how to hold the property. Your purchase runs through your own solicitor, your mortgage through your own lender or broker, and any tax planning through your own accountant. We never hold or pool investors' money.

We provide property, planning, licensing and building information to help you decide, not financial, tax or investment advice. Take regulated advice on finance and tax before you commit.

Within the project, you approve the design before any planning application, the written build quote before works start, and the furnishing specification before anything is ordered. If a stage turns up something that changes the picture, such as a planning refusal or a structural problem, we tell you in writing and set out the options before continuing.

How are planning and licensing handled in a turnkey project?

Planning comes first, because it decides how many people can live in the house. A house shared by three to six people falls in use class C4. Without an Article 4 direction, changing a family house to a small HMO is permitted development and needs no planning application; where a direction applies, planning permission is needed. Seven or more people is a large HMO, which always needs planning permission.

Licensing follows the design. A house with five or more people in two or more households needs a mandatory licence, and your council may license smaller HMOs too. Licence conditions include minimum room sizes, and councils set amenity standards for kitchens and bathrooms.

A conversion often requires building regulations approval as well, particularly for fire safety and sound insulation. We prepare each application, and our HMO licensing checker shows what we found for your council. Council planning, licence and building control fees are paid on top.

What happens at handover and first letting?

Once building work is complete, we hand over the certificates the house needs: a gas safety record from a Gas Safe registered engineer, an electrical installation condition report from a qualified electrician, fire alarm and emergency lighting certificates, and building control completion where the work required approval. These go into the licence application and the property file.

We then furnish the rooms and shared areas to the specification you approved, using furniture chosen for shared-house use. Rooms are photographed, advertised with the asking rent and let under the Renters' Rights Act rules, with referencing, Right to Rent checks where required and written tenancy terms.

At that point you choose how the house is run. You can carry on with our full management, run it yourself, or use our tenant find service as rooms come up. Either way, you receive the drawings, certificates and specification for your records.

What's included

  • One contract from purchase support to first tenants
  • Feasibility appraisal before you commit to buy
  • Design, planning and building control applications
  • Conversion works to a fixed written quote
  • Licence application, furnishing and first room lets
  • Optional ongoing management after handover

What does it cost?

Turnkey projects are quoted per property, stage by stage, so you see each cost before you approve it. For the build itself, typical Midlands guide ranges for building work per lettable room, including VAT where it applies, are:

  • light works: £1,800 to £3,500 per room;
  • standard conversion: £5,500 to £9,000 per room;
  • full strip-out: £9,000 to £14,000 per room.

En-suites, communal kitchens and extra bathrooms have their own guide ranges where the design includes them. All figures are typical ranges confirmed after a survey, and council licence, planning and building control fees are extra. Start with our quote form.

How it works

  1. Share your brief

    Tell us the area, budget range and the kind of HMO you have in mind.

  2. Checks before figures

    Planning, Article 4, licensing and room count are tested first.

  3. Appraisal and costs

    We set out the layout, the build cost range and the risks in writing.

  4. Deliver or step back

    Use us for the build and management, or take the appraisal and run it yourself.

Questions about turnkey HMO projects

Can I start a turnkey project after I have bought the house?

Yes. A project can start at design rather than purchase. We survey the house, check planning and licensing for the address, and pick up from whichever stage you have reached, with the same written quote and decision points.

Do I have to use your management service afterwards?

No. Management is optional. At handover you receive the drawings, certificates and specification, so you can run the house yourself, appoint another agent, or use our tenant find or management services.

What happens if planning permission is refused?

We tell you in writing and set out the options, which might include a revised design, fewer rooms, an appeal or stopping the project. Because each stage needs your approval, building work does not start until the planning position is settled.

Do you furnish the rooms as part of the project?

Yes. You approve a furnishing specification suited to shared-house use, covering beds, storage, desks and kitchen equipment, before anything is ordered. The furnishing cost is shown separately in your quote.

Can you arrange finance for a turnkey project?

No. We don't arrange or advise on finance. We can supply the drawings, specification and written cost information a lender or broker may ask for, but take regulated advice on mortgages, development finance and tax.

Planning an HMO in the Midlands?

Book a free survey. We measure every room, check the licensing and planning position, and give you a fixed written quote.

Call free Guide price