HMO licence applications in Long Eaton

Midlands HMO provides HMO licence application support in Long Eaton: we work out what Erewash Borough Council needs, gather the evidence and help you keep the house compliant.

We work in Long Eaton for landlords, investors and owners converting their own property.

  • Work by S&K and vetted subcontractors
  • Covering Long Eaton and nearby Derbyshire towns
  • Free survey and fixed written quote

Book a survey in Long Eaton

Tell us about the property. We reply within one working day.

If the property is in Long Eaton, the council that matters is Erewash Borough Council. We look up its current schemes for the address, note any conditions it usually attaches, and plan the work to suit.

Because we also manage and maintain HMOs, we design with day-to-day running in mind: hard-wearing finishes, sensible storage and layouts that keep shared spaces usable.

HMO rules in Erewash Borough Council

RuleErewash Borough Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingNot confirmed
Selective licensingNot confirmed
Article 4 direction for small HMOsDue to start
Due to start 6 March 2027: Ilkeston, most of Long Eaton and parts of Sandiacre and Sawley

Checked October 2026 against Erewash Borough Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Erewash Borough Council has confirmed an Article 4 direction covering Ilkeston, most of Long Eaton and parts of Sandiacre and Sawley, due to start on 6 March 2027. Whether a house in Long Eaton is inside the boundary is something we check for the exact address. Seven or more occupants always needs planning permission. We couldn't confirm whether Erewash Borough Council runs additional licensing, so we check with the council for the address.

HMO licence applications in Long Eaton: what we do

Licensing rules for shared houses in Long Eaton depend on the exact address. Mandatory licensing applies to every HMO with 5 or more occupiers, but additional or selective schemes can bring smaller houses into licensing too. We check which applies before preparing anything, so the application matches the scheme.

For landlords in Long Eaton and across Derbyshire, we prepare the floor plan, collect the certificates and complete the council's form. We follow the application through to a decision, help with any draft conditions and keep a note of the renewal date.

  • Licence holder, manager and fit and proper details prepared
  • Council application form completed and checked
  • Measured floor plan in the council's usual format
  • Gas, electrical, alarm and lighting certificates collated
  • Check of mandatory, additional and selective licensing at the address

HMO licence applications near Long Eaton

HMO licence applications in Long Eaton: common questions

What documents does Erewash Borough Council ask for with an HMO licence?

Councils usually ask for floor plans showing room sizes and fire safety features, gas and electrical safety certificates, and fire alarm and emergency lighting certificates. We check Erewash Borough Council's current list for your application.

How long does an HMO licence last?

A licence can last up to five years. Erewash Borough Council may grant a shorter licence, for example where it has concerns about the property or the management.

Who issues HMO licences in Long Eaton?

Erewash Borough Council is the licensing authority for Long Eaton. We prepare the application and supporting documents, and the council decides whether to grant the licence and on what conditions.

How often are electrical checks needed in an HMO?

Private tenancies in England need an electrical installation condition report before the tenancy starts and at least every five years, and gas appliances need a safety check by a Gas Safe registered engineer every 12 months.

Ready to talk about Long Eaton?

Call or send the form and we'll arrange a survey at a time that suits you.

Call free Guide price