HMO licence applications in Boston

Midlands HMO supports HMO landlords in Boston with HMO licence application, from measured plans and certificates to the works that close any gaps.

From Boston to the rest of Lincolnshire, quotes are fixed for the agreed specification.

  • Free survey and fixed written quote
  • Designed around Boston Borough Council's HMO standards
  • Covering Boston and nearby Lincolnshire towns

Ask about a house in Boston

Tell us about the property. We reply within one working day.

Most of the cost and risk in an HMO is decided at the design stage. In Boston we start by measuring every room and checking Boston Borough Council's position on licensing and planning, then build the specification around it.

Because we also manage and maintain HMOs, we design with day-to-day running in mind: hard-wearing finishes, sensible storage and layouts that keep shared spaces usable.

HMO rules in Boston Borough Council

RuleBoston Borough Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingNot confirmed
Selective licensingNot confirmed
Article 4 direction for small HMOsNot confirmed

Checked October 2026. Schemes change, so we confirm the position for your address before any work starts.

We couldn't confirm Boston Borough Council's Article 4 position from its own website, so we check it with the council for the address. Seven or more occupants always needs planning permission. We couldn't confirm whether Boston Borough Council runs additional licensing, so we check with the council for the address.

HMO licence applications in Boston: what we do

Licensing rules for shared houses in Boston depend on the exact address. Mandatory licensing applies to every HMO with 5 or more occupiers, but additional or selective schemes can bring smaller houses into licensing too. We check which applies before preparing anything, so the application matches the scheme.

For landlords in Boston and across Lincolnshire, we prepare the floor plan, collect the certificates and complete the council's form. We follow the application through to a decision, help with any draft conditions and keep a note of the renewal date.

  • Council application form completed and checked
  • Gas, electrical, alarm and lighting certificates collated
  • Help with draft conditions, renewals and variations
  • Check of mandatory, additional and selective licensing at the address
  • Measured floor plan in the council's usual format

HMO licence applications near Boston

Questions about HMO licence application in Boston

How often are electrical checks needed in an HMO?

Private tenancies in England need an electrical installation condition report before the tenancy starts and at least every five years, and gas appliances need a safety check by a Gas Safe registered engineer every 12 months.

How long does an HMO licence last?

A licence can last up to five years. Boston Borough Council may grant a shorter licence, for example where it has concerns about the property or the management.

Can you fix the issues a council inspection found?

Yes. We price the works on the inspection report, carry them out and provide the evidence the council asks for.

Who issues HMO licences in Boston?

Boston Borough Council is the licensing authority for Boston. We prepare the application and supporting documents, and the council decides whether to grant the licence and on what conditions.

Ready to talk about Boston?

Book a free survey. We measure every room, check Boston Borough Council's rules and give you a fixed written quote.

Call free Guide price