HMO planning and Article 4 in Smethwick

Our HMO planning permission service in Smethwick starts with the council's requirements for that address, not a generic checklist.

From Smethwick to the rest of the West Midlands, quotes are fixed for the agreed specification.

  • Designed around Sandwell Council's HMO standards
  • Covering Smethwick and nearby West Midlands towns
  • Free survey and fixed written quote

Free survey in Smethwick

Tell us about the property. We reply within one working day.

Most of the cost and risk in an HMO is decided at the design stage. In Smethwick we start by measuring every room and checking Sandwell Council's position on licensing and planning, then build the specification around it.

Work is carried out by S&K and vetted subcontractors working under S&K's supervision, so you contract with one company for the whole project.

HMO rules in Sandwell Council

RuleSandwell Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingIn force
Whole borough, 1 October 2024 to 30 September 2029
Selective licensingNone found
Article 4 direction for small HMOsProposed
Cabinet approved an immediate borough-wide direction on 14 October 2026; not confirmed as in force when checked

Checked October 2026 against Sandwell Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Sandwell Council's cabinet approved an immediate borough-wide Article 4 direction on 14 October 2026. We could not confirm whether it has been made, so we check with the council before any change of use. Seven or more occupants always needs planning permission. Sandwell Council also runs additional licensing across its whole area (until 30 September 2029), so smaller HMOs with three or four people from two or more households need a licence too.

Our HMO planning permission service in Smethwick

Planning for an HMO in Smethwick starts with three questions: what the current lawful use is, whether an Article 4 direction covers the street, and what local policy says about the concentration of shared houses. We answer all three before you spend money on design.

For landlords and investors in Smethwick and the rest of the West Midlands, we prepare planning applications and lawful development certificates, with the plans and evidence councils commonly ask for. We also explain where licensing and building regulations need a separate approval.

  • Check of lawful use, Article 4 and local HMO policies
  • Lawful development certificate applications with dated evidence
  • Planning statement covering concentration, amenity, parking and bins
  • Submission and liaison with the planning officer
  • Existing and proposed floor plans and site plans

HMO planning and Article 4 near Smethwick

HMO planning and Article 4 in Smethwick: common questions

Can you fix the issues a council inspection found?

Yes. We price the works on the inspection report, carry them out and provide the evidence the council asks for.

How often are electrical checks needed in an HMO?

Private tenancies in England need an electrical installation condition report before the tenancy starts and at least every five years, and gas appliances need a safety check by a Gas Safe registered engineer every 12 months.

What documents does Sandwell Council ask for with an HMO licence?

Councils usually ask for floor plans showing room sizes and fire safety features, gas and electrical safety certificates, and fire alarm and emergency lighting certificates. We check Sandwell Council's current list for your application.

Do HMOs in Smethwick need a fire risk assessment?

Fire safety law requires a fire risk assessment of the common parts of most HMOs, and councils commonly ask to see one with a licence application. We arrange the assessment and the works it recommends.

Ready to talk about Smethwick?

Book a free survey. We measure every room, check Sandwell Council's rules and give you a fixed written quote.

Call free Guide price