Large HMO conversions in Northfield

Midlands HMO designs and builds large HMO conversion schemes in Northfield, with room sizes, fire protection and shared facilities worked out before any walls go up.

From Northfield to the rest of the West Midlands, quotes are fixed for the agreed specification.

  • Free survey and fixed written quote
  • Designed around Birmingham City Council's HMO standards
  • Covering Northfield and nearby West Midlands towns

Ask about a house in Northfield

Tell us about the property. We reply within one working day.

Landlords in Northfield deal with Birmingham City Council for licensing, planning and housing standards. We keep those three in view together, so a layout that suits the licence also works for planning and building control.

We cover B31 and the neighbouring postcodes, with the same standards in Northfield as anywhere else in the West Midlands.

HMO rules in Birmingham City Council

RuleBirmingham City Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingIn force
Whole city, 5 June 2023 to 4 June 2028
Selective licensingIn part of the area
25 of the city's 69 wards, 5 June 2023 to 4 June 2028
Article 4 direction for small HMOsIn force
Whole city, in force since 8 June 2020

Checked October 2026 against Birmingham City Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Birmingham City Council has an Article 4 direction across its whole area, so turning a family house in Northfield into a small HMO needs planning permission. We prepare the planning application before any conversion work starts. Seven or more occupants always needs planning permission. Birmingham City Council also runs additional licensing across its whole area (until 4 June 2028), so smaller HMOs with three or four people from two or more households need a licence too.

Large HMO conversions for Northfield landlords

For larger houses and buildings in Northfield, we assess whether an HMO for seven or more people is realistic before any design money is spent. That means checking local planning policy, the structure, the escape routes and how many kitchens and bathrooms the occupancy would need.

If the scheme works, we prepare the planning drawings, agree the fire strategy with building control and build floor by floor. It suits bigger properties in Northfield and across the West Midlands where a six-bedroom layout would leave usable space empty.

  • Fire strategy agreed with building control at the start
  • Planning drawings and room schedule for the application
  • Feasibility check of the building, layout and planning policy
  • Floor-by-floor build programme with building control inspections
  • Kitchens and bathrooms sized to council amenity standards

Large HMO conversions near Northfield

Questions about large HMO conversion in Northfield

Can you work on a house I haven't bought yet in Northfield?

Yes. We can survey before you buy and tell you the likely room count, the planning and licensing position and a guide cost, so you can decide with the facts in front of you.

Do you handle building regulations for conversions in Northfield?

Yes. An HMO conversion often involves building regulations work such as fire protection, new partitions and drainage, and we arrange approval and inspections with local authority building control or a registered building control approver.

Do I need planning permission to convert a house to an HMO in Northfield?

It depends on the number of occupants and whether Birmingham City Council has an Article 4 direction covering the address. Seven or more occupants always needs planning permission. We check the position for your street before quoting.

Does a converted HMO in Northfield need a licence?

Yes if five or more people from two or more households will live there, because mandatory licensing applies in every council in England. Birmingham City Council may also license smaller HMOs, which we check for the address.

Ready to talk about Northfield?

Send us the address and we'll check the licensing and planning position before we talk about prices.

Call free Guide price