HMO conversions in Yardley

Planning HMO conversion work in Yardley? We check the licensing and planning position with Birmingham City Council, design the layout and give you a fixed written quote.

Every job in Yardley starts with a measured survey and a check of Birmingham City Council's current HMO rules.

  • Free survey and fixed written quote
  • Quotes itemised so you can compare
  • Covering Yardley and nearby West Midlands towns

Ask about a house in Yardley

Tell us about the property. We reply within one working day.

If the property is in Yardley, the council that matters is Birmingham City Council. We look up its current schemes for the address, note any conditions it usually attaches, and plan the work to suit.

We can keep a photographic record of each stage, which is useful evidence when the council inspects or a buyer's surveyor asks questions later.

HMO rules in Birmingham City Council

RuleBirmingham City Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingIn force
Whole city, 5 June 2023 to 4 June 2028
Selective licensingIn part of the area
25 of the city's 69 wards, 5 June 2023 to 4 June 2028
Article 4 direction for small HMOsIn force
Whole city, in force since 8 June 2020

Checked October 2026 against Birmingham City Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Birmingham City Council has an Article 4 direction across its whole area, so turning a family house in Yardley into a small HMO needs planning permission. We prepare the planning application before any conversion work starts. Seven or more occupants always needs planning permission. Birmingham City Council also runs additional licensing across its whole area (until 4 June 2028), so smaller HMOs with three or four people from two or more households need a licence too.

HMO conversions in Yardley: what we do

Our HMO conversion work in Yardley starts with a measured survey and a check of the planning and licensing rules that apply to the street. We design the room layout, shared facilities and escape route around those rules, then price the agreed specification in an itemised written quote.

Two houses in Yardley that look alike from outside can give different room counts once the kitchen, stairs and bathrooms are measured. We give you a realistic number early, then build across the West Midlands with our own team and vetted subcontractors under a single contract.

  • Certificates, floor plans and photos handed over for licensing
  • Bedroom layout designed to national and council size standards
  • Planning use class and Article 4 check for the address
  • Measured survey of every room and shared space
  • Building control application and sign-off where required

HMO conversions near Yardley

Questions about HMO conversion in Yardley

Does a converted HMO in Yardley need a licence?

Yes if five or more people from two or more households will live there, because mandatory licensing applies in every council in England. Birmingham City Council may also license smaller HMOs, which we check for the address.

Can you work on a house I haven't bought yet in Yardley?

Yes. We can survey before you buy and tell you the likely room count, the planning and licensing position and a guide cost, so you can decide with the facts in front of you.

Do I need planning permission to convert a house to an HMO in Yardley?

It depends on the number of occupants and whether Birmingham City Council has an Article 4 direction covering the address. Seven or more occupants always needs planning permission. We check the position for your street before quoting.

Do you supply fire doors and alarms as part of a conversion?

Yes. Fire doors, the alarm system and emergency lighting are specified to the fire risk of the house and included in the price, not added later.

Got a house in Yardley in mind?

Book a free survey. We measure every room, check Birmingham City Council's rules and give you a fixed written quote.

Call free Guide price