HMO floor plans in Nottinghamshire

From Beeston, Clifton to the smaller towns, we provide HMO floor plan services across Nottinghamshire in the East Midlands.

We cover Nottinghamshire from our base in Great Barr, Birmingham, with surveys arranged across the county.

  • One team for build, compliance and lettings
  • Quotes itemised so you can compare
  • Free survey and fixed written quote

Book a survey in Nottinghamshire

Tell us about the property. We reply within one working day.

Our work in Nottinghamshire ranges from single conversions for first-time landlords to multi-house programmes for investors, all priced in writing before work starts.

In Nottinghamshire, as everywhere in England, a house with five or more people forming two or more households needs a mandatory HMO licence. Some councils go further with additional licensing or Article 4 directions, as the table shows.

HMO rules across Nottinghamshire's councils

CouncilAdditional licensingSelective licensingArticle 4 (small HMOs)
Ashfield District CouncilNone foundIn part of the area
Designated streets in Stanton Hill and Sutton Central, 25 July 2022 to 24 July 2027
Not confirmed
Bassetlaw District CouncilNot confirmedNot confirmedNot confirmed
Broxtowe Borough CouncilNot confirmedNot confirmedIn part of the area
Parts of the four Beeston wards since 26 March 2022. An extension to Eastwood, Kimberley and Stapleford was proposed in March 2026
Gedling Borough CouncilNone foundIn part of the area
Netherfield ward and parts of Carlton Hill, Colwick, Daybrook and Newstead Village
Proposed
Proposed for three streets in Netherfield, not in force when checked
Mansfield District CouncilNone foundIn part of the area
Designated streets in several wards, from 13 September 2025
Not confirmed
Newark and Sherwood District CouncilNot confirmedNot confirmedNot confirmed
Nottingham City CouncilIn force
Whole city, 1 January 2024 to 31 December 2028
In part of the area
Some or all of 15 wards, 1 December 2023 to 30 November 2028
In force
Whole city, since 11 March 2012
Rushcliffe Borough CouncilNot confirmedNot confirmedNot confirmed

Checked October 2026. Mandatory licensing for five or more people applies in every council. Schemes change, so we confirm the position for the address before work starts.

Councils in Nottinghamshire where we found an Article 4 direction for small HMOs in force, in all or part of their area: Broxtowe Borough Council, Nottingham City Council. Article 4 directions are due to start or proposed in: Gedling Borough Council. Additional licensing applies in all or part of: Nottingham City Council.

How we handle HMO floor plan work in Nottinghamshire

Licence applications for HMOs in Nottinghamshire commonly need a floor plan showing room sizes, room use, fire safety features and amenities. We measure the house on site, check the format the council asks for and draw plans that match the property as it is today.

For landlords across Nottinghamshire, our plans also support planning applications, building control and fire risk assessments. If you have changed the layout of a house in Nottinghamshire, we can update existing plans before a renewal, variation or sale.

  • Floor areas in square metres, with 1.5 m ceiling exclusions
  • Escape routes, final exits and shared amenities marked
  • Room use and intended occupancy marked for each bedroom
  • On-site measurement of every room and floor
  • Plans supplied as PDF in your council's usual format

Towns we cover in Nottinghamshire

HMO floor plans in Nottinghamshire: common questions

Who issues HMO licences in Nottinghamshire?

the local council is the licensing authority for Nottinghamshire. We prepare the application and supporting documents, and the council decides whether to grant the licence and on what conditions.

How long does an HMO licence last?

A licence can last up to five years. the local council may grant a shorter licence, for example where it has concerns about the property or the management.

Do HMOs in Nottinghamshire need a fire risk assessment?

Fire safety law requires a fire risk assessment of the common parts of most HMOs, and councils commonly ask to see one with a licence application. We arrange the assessment and the works it recommends.

How often are electrical checks needed in an HMO?

Private tenancies in England need an electrical installation condition report before the tenancy starts and at least every five years, and gas appliances need a safety check by a Gas Safe registered engineer every 12 months.

Got a house in Nottinghamshire in mind?

Call or send the form and we'll arrange a survey at a time that suits you.

Call free Guide price