HMO floor plans in Arnold

For landlords in Arnold, our HMO floor plan service turns the council's requirements into a clear list of documents, works and dates.

Every job in Arnold starts with a measured survey and a check of Gedling Borough Council's current HMO rules.

  • Covering Arnold and nearby Nottinghamshire towns
  • Designed around Gedling Borough Council's HMO standards
  • Work by S&K and vetted subcontractors

Free survey in Arnold

Tell us about the property. We reply within one working day.

Gedling Borough Council is the licensing and planning authority for Arnold. We check its rules for the exact street before we draw a single partition.

We'll tell you plainly if a house in Arnold isn't suited to the number of rooms you have in mind, and what it would take to make it work.

HMO rules in Gedling Borough Council

RuleGedling Borough Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingNone found
Selective licensingIn part of the area
Netherfield ward and parts of Carlton Hill, Colwick, Daybrook and Newstead Village
Article 4 direction for small HMOsProposed
Proposed for three streets in Netherfield, not in force when checked

Checked October 2026 against Gedling Borough Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Gedling Borough Council has proposed an Article 4 direction for three streets in Netherfield. None was in force when we checked. Seven or more occupants always needs planning permission. We found no additional licensing scheme in force in Gedling Borough Council, so the mandatory licence for five or more people is the main one to plan for.

HMO floor plans in Arnold: what we do

Licence applications for HMOs in Arnold commonly need a floor plan showing room sizes, room use, fire safety features and amenities. We measure the house on site, check the format the council asks for and draw plans that match the property as it is today.

For landlords across Nottinghamshire, our plans also support planning applications, building control and fire risk assessments. If you have changed the layout of a house in Arnold, we can update existing plans before a renewal, variation or sale.

  • On-site measurement of every room and floor
  • Room use and intended occupancy marked for each bedroom
  • Escape routes, final exits and shared amenities marked
  • Plans supplied as PDF in your council's usual format
  • Fire doors, detectors, alarm panel and emergency lighting shown

HMO floor plans near Arnold

HMO floor plans in Arnold: common questions

Can you fix the issues a council inspection found?

Yes. We price the works on the inspection report, carry them out and provide the evidence the council asks for.

How often are electrical checks needed in an HMO?

Private tenancies in England need an electrical installation condition report before the tenancy starts and at least every five years, and gas appliances need a safety check by a Gas Safe registered engineer every 12 months.

Do HMOs in Arnold need a fire risk assessment?

Fire safety law requires a fire risk assessment of the common parts of most HMOs, and councils commonly ask to see one with a licence application. We arrange the assessment and the works it recommends.

Do I need a licence for a three or four person HMO in Arnold?

Not under a council scheme we could find when we checked. Mandatory licensing starts at five people, and councils can add schemes, so we confirm with Gedling Borough Council before you let.

Planning an HMO in Arnold?

Send us the address and we'll check the licensing and planning position before we talk about prices.

Call free Guide price