Communal kitchens and bathrooms in Madeley

Planning HMO kitchen and bathroom work in Madeley? We check the licensing and planning position with Telford & Wrekin Council, design the layout and give you a fixed written quote.

From Madeley to the rest of Shropshire, quotes are fixed for the agreed specification.

  • Free survey and fixed written quote
  • Quotes itemised so you can compare
  • Designed around Telford & Wrekin Council's HMO standards

Get a quote for Madeley

Tell us about the property. We reply within one working day.

HMO projects in Madeley are shaped by the rules of Telford & Wrekin Council. Before we price anything, we check whether the address falls within an additional licensing scheme or an Article 4 direction, because both change what the house needs and how long it takes.

You get one point of contact for the whole job, a fixed price for the agreed specification and a written programme showing when each stage happens.

HMO rules in Telford & Wrekin Council

RuleTelford & Wrekin Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingNone found
A planned borough-wide scheme was revoked in September 2026
Selective licensingNot confirmed
Article 4 direction for small HMOsDue to start
Borough-wide, due to start 27 February 2027

Checked October 2026 against Telford & Wrekin Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Telford & Wrekin Council has confirmed a borough-wide Article 4 direction that starts on 27 February 2027. From then, turning a family house in Madeley into a small HMO will need planning permission, so we check your programme against that date. Seven or more occupants always needs planning permission. Telford & Wrekin Council revoked a planned borough-wide additional licensing scheme in September 2026, so the mandatory licence for five or more people is the main one to plan for.

Our HMO kitchen and bathroom service in Madeley

We design and fit communal kitchens and shared bathrooms for HMOs in Madeley, sized to the amenity standards the local council applies to the number of people in the house. Those standards differ between councils, so we check the current version for Madeley before drawing anything.

Fittings for houses in Madeley are chosen for heavy daily use: sealed worktops, wipe-clean wall panels, separate food storage and isolation valves on every fitting. Across Shropshire, each kitchen gets the heat detection and fire blanket the fire risk assessment calls for.

  • Extract ventilation and certified electrical work
  • Isolation valves on every fitting
  • Separate food storage space for each occupant
  • Heat detection and fire blanket where required
  • Heavy-duty units, sealed worktops and slip-resistant flooring

Communal kitchens and bathrooms near Madeley

Questions about HMO kitchen and bathroom in Madeley

How long does an HMO conversion in Madeley take?

It depends on the size of the house and the work involved. Your written quote includes a programme for each stage, and any planning or licensing time is shown separately.

Does a converted HMO in Madeley need a licence?

Yes if five or more people from two or more households will live there, because mandatory licensing applies in every council in England. Telford & Wrekin Council may also license smaller HMOs, which we check for the address.

What size must bedrooms be in an HMO in Madeley?

For licensed HMOs in England a room for one adult must be at least 6.51 square metres and a room for two adults at least 10.22 square metres. Telford & Wrekin Council may set additional standards, which we design to.

Can you convert part of a building above a shop in Madeley?

Often, yes. Flats above shops need extra attention to fire separation from the commercial unit, and we assess this at survey stage.

Ready to talk about Madeley?

Call or send the form and we'll arrange a survey at a time that suits you.

Call free Guide price