HMO refurbishment in Wellingborough

In Wellingborough, our HMO refurbishment service covers design, building work and the fire safety detail a council inspector looks for, quoted at a fixed price.

Our base in Great Barr is about 55 miles from Wellingborough, so surveys and site visits are straightforward to arrange.

  • One team for build, compliance and lettings
  • Designed around North Northamptonshire Council's HMO standards
  • Work by S&K and vetted subcontractors

Ask about a house in Wellingborough

Tell us about the property. We reply within one working day.

Landlords in Wellingborough deal with North Northamptonshire Council for licensing, planning and housing standards. We keep those three in view together, so a layout that suits the licence also works for planning and building control.

You get one point of contact for the whole job, a fixed price for the agreed specification and a written programme showing when each stage happens.

HMO rules in North Northamptonshire Council

RuleNorth Northamptonshire Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingNone found
Selective licensingNone found
Article 4 direction for small HMOsIn part of the area
Kingswood ward in Corby only, since 24 April 2024

Checked October 2026 against North Northamptonshire Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

North Northamptonshire Council's Article 4 direction covers Kingswood ward in Corby only, not Wellingborough, so changing a family house here into a small HMO is usually permitted development. Seven or more occupants always needs planning permission. We found no additional licensing scheme in force in North Northamptonshire Council, so the mandatory licence for five or more people is the main one to plan for.

HMO refurbishment for Wellingborough landlords

We refurbish existing HMOs in Wellingborough that have fallen behind current standards, whether the prompt is a licence renewal, a council inspection or rooms that have become hard to let. The survey splits the work into safety, licence and optional items so the priorities are clear.

Where rooms in a Wellingborough house are still let, we phase the work so tenants keep a working kitchen, bathroom and alarm system throughout. For landlords across Northamptonshire, each job ends with updated certificates and photos ready to send to the council.

  • Room-by-room condition and compliance survey
  • Kitchens, bathrooms, electrics and decoration renewed as agreed
  • Fire doors, alarms and escape routes brought up to standard
  • Works list split into safety, licence and optional items
  • Phasing plan that keeps occupied rooms usable

HMO refurbishment near Wellingborough

Questions about HMO refurbishment in Wellingborough

Does a converted HMO in Wellingborough need a licence?

Yes if five or more people from two or more households will live there, because mandatory licensing applies in every council in England. North Northamptonshire Council may also license smaller HMOs, which we check for the address.

Do you handle building regulations for conversions in Wellingborough?

Yes. An HMO conversion often involves building regulations work such as fire protection, new partitions and drainage, and we arrange approval and inspections with local authority building control or a registered building control approver.

Do you supply fire doors and alarms as part of a conversion?

Yes. Fire doors, the alarm system and emergency lighting are specified to the fire risk of the house and included in the price, not added later.

How long does an HMO conversion in Wellingborough take?

It depends on the size of the house and the work involved. Your written quote includes a programme for each stage, and any planning or licensing time is shown separately.

Got a house in Wellingborough in mind?

Send us the address and we'll check the licensing and planning position before we talk about prices.

Call free Guide price