HMO refurbishment in Wellington

Planning HMO refurbishment work in Wellington? We check the licensing and planning position with Telford & Wrekin Council, design the layout and give you a fixed written quote.

We cover Wellington and the surrounding Shropshire postcodes, including TF1.

  • Covering Wellington and nearby Shropshire towns
  • One team for build, compliance and lettings
  • Free survey and fixed written quote

Free survey in Wellington

Tell us about the property. We reply within one working day.

Most of the cost and risk in an HMO is decided at the design stage. In Wellington we start by measuring every room and checking Telford & Wrekin Council's position on licensing and planning, then build the specification around it.

We cover TF1 and the neighbouring postcodes, with the same standards in Wellington as anywhere else in Shropshire.

HMO rules in Telford & Wrekin Council

RuleTelford & Wrekin Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingNone found
A planned borough-wide scheme was revoked in September 2026
Selective licensingNot confirmed
Article 4 direction for small HMOsDue to start
Borough-wide, due to start 27 February 2027

Checked October 2026 against Telford & Wrekin Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Telford & Wrekin Council has confirmed a borough-wide Article 4 direction that starts on 27 February 2027. From then, turning a family house in Wellington into a small HMO will need planning permission, so we check your programme against that date. Seven or more occupants always needs planning permission. Telford & Wrekin Council revoked a planned borough-wide additional licensing scheme in September 2026, so the mandatory licence for five or more people is the main one to plan for.

Our HMO refurbishment service in Wellington

We refurbish existing HMOs in Wellington that have fallen behind current standards, whether the prompt is a licence renewal, a council inspection or rooms that have become hard to let. The survey splits the work into safety, licence and optional items so the priorities are clear.

Where rooms in a Wellington house are still let, we phase the work so tenants keep a working kitchen, bathroom and alarm system throughout. For landlords across Shropshire, each job ends with updated certificates and photos ready to send to the council.

  • Works list split into safety, licence and optional items
  • Before and after photos and updated certificates
  • Room-by-room condition and compliance survey
  • Fire doors, alarms and escape routes brought up to standard
  • Phasing plan that keeps occupied rooms usable

HMO refurbishment near Wellington

Questions about HMO refurbishment in Wellington

How long does an HMO conversion in Wellington take?

It depends on the size of the house and the work involved. Your written quote includes a programme for each stage, and any planning or licensing time is shown separately.

Can you work on a house I haven't bought yet in Wellington?

Yes. We can survey before you buy and tell you the likely room count, the planning and licensing position and a guide cost, so you can decide with the facts in front of you.

What size must bedrooms be in an HMO in Wellington?

For licensed HMOs in England a room for one adult must be at least 6.51 square metres and a room for two adults at least 10.22 square metres. Telford & Wrekin Council may set additional standards, which we design to.

Do you handle building regulations for conversions in Wellington?

Yes. An HMO conversion often involves building regulations work such as fire protection, new partitions and drainage, and we arrange approval and inspections with local authority building control or a registered building control approver.

Planning an HMO in Wellington?

Send us the address and we'll check the licensing and planning position before we talk about prices.

Call free Guide price