HMO refurbishment in Kings Heath

Midlands HMO designs and builds HMO refurbishment schemes in Kings Heath, with room sizes, fire protection and shared facilities worked out before any walls go up.

Tell us about the property in Kings Heath and we'll arrange a free survey at a time that suits you.

  • One team for build, compliance and lettings
  • Free survey and fixed written quote
  • Covering Kings Heath and nearby West Midlands towns

Ask about a house in Kings Heath

Tell us about the property. We reply within one working day.

Most of the cost and risk in an HMO is decided at the design stage. In Kings Heath we start by measuring every room and checking Birmingham City Council's position on licensing and planning, then build the specification around it.

Work is carried out by S&K and vetted subcontractors working under S&K's supervision, so you contract with one company for the whole project.

HMO rules in Birmingham City Council

RuleBirmingham City Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingIn force
Whole city, 5 June 2023 to 4 June 2028
Selective licensingIn part of the area
25 of the city's 69 wards, 5 June 2023 to 4 June 2028
Article 4 direction for small HMOsIn force
Whole city, in force since 8 June 2020

Checked October 2026 against Birmingham City Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Birmingham City Council has an Article 4 direction across its whole area, so turning a family house in Kings Heath into a small HMO needs planning permission. We prepare the planning application before any conversion work starts. Seven or more occupants always needs planning permission. Birmingham City Council also runs additional licensing across its whole area (until 4 June 2028), so smaller HMOs with three or four people from two or more households need a licence too.

Our HMO refurbishment service in Kings Heath

We refurbish existing HMOs in Kings Heath that have fallen behind current standards, whether the prompt is a licence renewal, a council inspection or rooms that have become hard to let. The survey splits the work into safety, licence and optional items so the priorities are clear.

Where rooms in a Kings Heath house are still let, we phase the work so tenants keep a working kitchen, bathroom and alarm system throughout. For landlords across the West Midlands, each job ends with updated certificates and photos ready to send to the council.

  • Fire doors, alarms and escape routes brought up to standard
  • Kitchens, bathrooms, electrics and decoration renewed as agreed
  • Room-by-room condition and compliance survey
  • Phasing plan that keeps occupied rooms usable
  • Works list split into safety, licence and optional items

HMO refurbishment near Kings Heath

Questions about HMO refurbishment in Kings Heath

What size must bedrooms be in an HMO in Kings Heath?

For licensed HMOs in England a room for one adult must be at least 6.51 square metres and a room for two adults at least 10.22 square metres. Birmingham City Council may set additional standards, which we design to.

Can you convert part of a building above a shop in Kings Heath?

Often, yes. Flats above shops need extra attention to fire separation from the commercial unit, and we assess this at survey stage.

How long does an HMO conversion in Kings Heath take?

It depends on the size of the house and the work involved. Your written quote includes a programme for each stage, and any planning or licensing time is shown separately.

Does a converted HMO in Kings Heath need a licence?

Yes if five or more people from two or more households will live there, because mandatory licensing applies in every council in England. Birmingham City Council may also license smaller HMOs, which we check for the address.

Need HMO refurbishment help in Kings Heath?

Send us the address and we'll check the licensing and planning position before we talk about prices.

Call free Guide price