HMO projects in Daventry are shaped by the rules of West Northamptonshire Council. Before we price anything, we check whether the address falls within an additional licensing scheme or an Article 4 direction, because both change what the house needs and how long it takes.
Our team is based in Great Barr, Birmingham, about 38 miles from Daventry. That keeps survey visits, site meetings and follow-up inspections easy to arrange.
HMO rules in West Northamptonshire Council
| Rule | West Northamptonshire Council |
|---|---|
| Mandatory HMO licence (5+ people) | In force everywhere in England |
| Additional HMO licensing | In part of the area Parts of Northampton and Daventry, 24 February 2025 to 23 February 2030 |
| Selective licensing | None found |
| Article 4 direction for small HMOs | In part of the area The whole former Northampton borough, plus the Boughton Rise development |
Checked October 2026 against West Northamptonshire Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.
West Northamptonshire Council's Article 4 direction covers the whole former Northampton borough, not Daventry, so changing a family house here into a small HMO is usually permitted development. Seven or more occupants always needs planning permission. West Northamptonshire Council runs additional licensing in parts of Northampton and Daventry, so smaller HMOs there need a licence too. We check whether the address in Daventry is covered.
Large HMO conversions for Daventry landlords
For larger houses and buildings in Daventry, we assess whether an HMO for seven or more people is realistic before any design money is spent. That means checking local planning policy, the structure, the escape routes and how many kitchens and bathrooms the occupancy would need.
If the scheme works, we prepare the planning drawings, agree the fire strategy with building control and build floor by floor. It suits bigger properties in Daventry and across Northamptonshire where a six-bedroom layout would leave usable space empty.
- Kitchens and bathrooms sized to council amenity standards
- Feasibility check of the building, layout and planning policy
- Handover file prepared for the mandatory licence
- Floor-by-floor build programme with building control inspections
- Fire strategy agreed with building control at the start
Large HMO conversions near Daventry
- Rugby 9 miles
- Towcester 11.2 miles
- Northampton 11.7 miles
- Lutterworth 13.9 miles
- Brackley 15.5 miles
- Leamington Spa 16 miles
