Our work in Northamptonshire ranges from single conversions for first-time landlords to multi-house programmes for investors, all priced in writing before work starts.
We plan each large HMO conversion job in Northamptonshire around the local council's amenity standards, which set out kitchen, bathroom and room-size requirements for shared houses.
HMO rules across Northamptonshire's councils
| Council | Additional licensing | Selective licensing | Article 4 (small HMOs) |
|---|---|---|---|
| North Northamptonshire Council | None found | None found | In part of the area Kingswood ward in Corby only, since 24 April 2024 |
| West Northamptonshire Council | In part of the area Parts of Northampton and Daventry, 24 February 2025 to 23 February 2030 | None found | In part of the area The whole former Northampton borough, plus the Boughton Rise development |
Checked October 2026. Mandatory licensing for five or more people applies in every council. Schemes change, so we confirm the position for the address before work starts.
Councils in Northamptonshire where we found an Article 4 direction for small HMOs in force, in all or part of their area: North Northamptonshire Council, West Northamptonshire Council. Additional licensing applies in all or part of: West Northamptonshire Council.
Our large HMO conversion service in Northamptonshire
For larger houses and buildings in Northamptonshire, we assess whether an HMO for seven or more people is realistic before any design money is spent. That means checking local planning policy, the structure, the escape routes and how many kitchens and bathrooms the occupancy would need.
If the scheme works, we prepare the planning drawings, agree the fire strategy with building control and build floor by floor. It suits bigger properties in Northamptonshire where a six-bedroom layout would leave usable space empty.
- Kitchens and bathrooms sized to council amenity standards
- Feasibility check of the building, layout and planning policy
- Fire strategy agreed with building control at the start
- Handover file prepared for the mandatory licence
- Floor-by-floor build programme with building control inspections
