Our work in Shropshire ranges from single conversions for first-time landlords to multi-house programmes for investors, all priced in writing before work starts.
In Shropshire, as everywhere in England, a house with five or more people forming two or more households needs a mandatory HMO licence. Some councils go further with additional licensing or Article 4 directions, as the table shows.
HMO rules across Shropshire's councils
| Council | Additional licensing | Selective licensing | Article 4 (small HMOs) |
|---|---|---|---|
| Shropshire Council | Not confirmed | Not confirmed | Not confirmed |
| Telford & Wrekin Council | None found A planned borough-wide scheme was revoked in September 2026 | Not confirmed | Due to start Borough-wide, due to start 27 February 2027 |
Checked October 2026. Mandatory licensing for five or more people applies in every council. Schemes change, so we confirm the position for the address before work starts.
We found no Article 4 directions for small HMOs in force among Shropshire's councils that we could confirm. Large HMOs always need planning permission. Article 4 directions are due to start or proposed in: Telford & Wrekin Council. We found no additional licensing schemes in force that we could confirm, so the mandatory licence for five or more people is the main one to plan for.
Our large HMO conversion service in Shropshire
For larger houses and buildings in Shropshire, we assess whether an HMO for seven or more people is realistic before any design money is spent. That means checking local planning policy, the structure, the escape routes and how many kitchens and bathrooms the occupancy would need.
If the scheme works, we prepare the planning drawings, agree the fire strategy with building control and build floor by floor. It suits bigger properties in Shropshire where a six-bedroom layout would leave usable space empty.
- Kitchens and bathrooms sized to council amenity standards
- Feasibility check of the building, layout and planning policy
- Planning drawings and room schedule for the application
- Fire strategy agreed with building control at the start
- Floor-by-floor build programme with building control inspections
