HMO floor plans in Moseley

Our HMO floor plan service in Moseley starts with the council's requirements for that address, not a generic checklist.

Whether the house in Moseley is empty, let or mid-purchase, we can start with the survey.

  • Quotes itemised so you can compare
  • One team for build, compliance and lettings
  • Designed around Birmingham City Council's HMO standards

Book a survey in Moseley

Tell us about the property. We reply within one working day.

Shared houses in Moseley need to satisfy Birmingham City Council's licensing team as well as building regulations. We plan for both from the first survey, which avoids rework later.

Work is carried out by S&K and vetted subcontractors working under S&K's supervision, so you contract with one company for the whole project.

HMO rules in Birmingham City Council

RuleBirmingham City Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingIn force
Whole city, 5 June 2023 to 4 June 2028
Selective licensingIn part of the area
25 of the city's 69 wards, 5 June 2023 to 4 June 2028
Article 4 direction for small HMOsIn force
Whole city, in force since 8 June 2020

Checked October 2026 against Birmingham City Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Birmingham City Council has an Article 4 direction across its whole area, so turning a family house in Moseley into a small HMO needs planning permission. We check the planning history of the address as part of any licence work. Seven or more occupants always needs planning permission. Birmingham City Council also runs additional licensing across its whole area (until 4 June 2028), so smaller HMOs with three or four people from two or more households need a licence too.

Our HMO floor plan service in Moseley

Licence applications for HMOs in Moseley commonly need a floor plan showing room sizes, room use, fire safety features and amenities. We measure the house on site, check the format the council asks for and draw plans that match the property as it is today.

For landlords across the West Midlands, our plans also support planning applications, building control and fire risk assessments. If you have changed the layout of a house in Moseley, we can update existing plans before a renewal, variation or sale.

  • Room use and intended occupancy marked for each bedroom
  • Escape routes, final exits and shared amenities marked
  • On-site measurement of every room and floor
  • Plans supplied as PDF in your council's usual format
  • Floor areas in square metres, with 1.5 m ceiling exclusions

HMO floor plans near Moseley

What landlords in Moseley ask us

What happens if I let an unlicensed HMO in Moseley?

Since 1 May 2026 councils can issue civil penalties of up to £40,000, and rent repayment orders can cover up to two years' rent. If a house in Moseley needs a licence, apply as soon as possible.

Who issues HMO licences in Moseley?

Birmingham City Council is the licensing authority for Moseley. We prepare the application and supporting documents, and the council decides whether to grant the licence and on what conditions.

Can you fix the issues a council inspection found?

Yes. We price the works on the inspection report, carry them out and provide the evidence the council asks for.

How often are electrical checks needed in an HMO?

Private tenancies in England need an electrical installation condition report before the tenancy starts and at least every five years, and gas appliances need a safety check by a Gas Safe registered engineer every 12 months.

Got a house in Moseley in mind?

Call or send the form and we'll arrange a survey at a time that suits you.

Call free Guide price