Communal kitchens and bathrooms in Halesowen

We carry out HMO kitchen and bathroom projects in Halesowen and across the West Midlands, from the first measured survey to a house that is ready for its licence inspection.

Tell us about the property in Halesowen and we'll arrange a free survey at a time that suits you.

  • Covering Halesowen and nearby West Midlands towns
  • One team for build, compliance and lettings
  • Quotes itemised so you can compare

Get a quote for Halesowen

Tell us about the property. We reply within one working day.

Most of the cost and risk in an HMO is decided at the design stage. In Halesowen we start by measuring every room and checking Dudley Council's position on licensing and planning, then build the specification around it.

We'll tell you plainly if a house in Halesowen isn't suited to the number of rooms you have in mind, and what it would take to make it work.

HMO rules in Dudley Council

RuleDudley Council
Mandatory HMO licence (5+ people)In force everywhere in England
Additional HMO licensingNot confirmed
Selective licensingNot confirmed
Article 4 direction for small HMOsIn force
Whole borough, since 15 September 2023

Checked October 2026 against Dudley Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.

Dudley Council has an Article 4 direction across its whole area, so turning a family house in Halesowen into a small HMO needs planning permission. We prepare the planning application before any conversion work starts. Seven or more occupants always needs planning permission. We couldn't confirm whether Dudley Council runs additional licensing, so we check with the council for the address.

How we handle HMO kitchen and bathroom work in Halesowen

We design and fit communal kitchens and shared bathrooms for HMOs in Halesowen, sized to the amenity standards the local council applies to the number of people in the house. Those standards differ between councils, so we check the current version for Halesowen before drawing anything.

Fittings for houses in Halesowen are chosen for heavy daily use: sealed worktops, wipe-clean wall panels, separate food storage and isolation valves on every fitting. Across the West Midlands, each kitchen gets the heat detection and fire blanket the fire risk assessment calls for.

  • Layout sized to your council's amenity standards
  • Extract ventilation and certified electrical work
  • Heavy-duty units, sealed worktops and slip-resistant flooring
  • Isolation valves on every fitting
  • Heat detection and fire blanket where required

Communal kitchens and bathrooms near Halesowen

Questions about HMO kitchen and bathroom in Halesowen

Do you handle building regulations for conversions in Halesowen?

Yes. An HMO conversion often involves building regulations work such as fire protection, new partitions and drainage, and we arrange approval and inspections with local authority building control or a registered building control approver.

Do I need planning permission to convert a house to an HMO in Halesowen?

It depends on the number of occupants and whether Dudley Council has an Article 4 direction covering the address. Seven or more occupants always needs planning permission. We check the position for your street before quoting.

How long does an HMO conversion in Halesowen take?

It depends on the size of the house and the work involved. Your written quote includes a programme for each stage, and any planning or licensing time is shown separately.

What size must bedrooms be in an HMO in Halesowen?

For licensed HMOs in England a room for one adult must be at least 6.51 square metres and a room for two adults at least 10.22 square metres. Dudley Council may set additional standards, which we design to.

Planning an HMO in Halesowen?

Send us the address and we'll check the licensing and planning position before we talk about prices.

Call free Guide price