If the property is in Rugby, the council that matters is Rugby Borough Council. We look up its current schemes for the address, note any conditions it usually attaches, and plan the work to suit.
Work is carried out by S&K and vetted subcontractors working under S&K's supervision, so you contract with one company for the whole project.
HMO rules in Rugby Borough Council
| Rule | Rugby Borough Council |
|---|---|
| Mandatory HMO licence (5+ people) | In force everywhere in England |
| Additional HMO licensing | Not confirmed |
| Selective licensing | Not confirmed |
| Article 4 direction for small HMOs | In part of the area Five central wards: Benn, Coton and Boughton, Eastlands, New Bilton, and Newbold and Brownsover, since 23 February 2025 |
Checked October 2026 against Rugby Borough Council's HMO licensing page. Schemes change, so we confirm the position for your address before any work starts.
Rugby Borough Council's Article 4 direction covers five central wards of Rugby. Whether a house in Rugby needs planning permission to become a small HMO depends on whether it is inside that boundary, which we check for the exact address. Seven or more occupants always needs planning permission. We couldn't confirm whether Rugby Borough Council runs additional licensing, so we check with the council for the address.
En-suite installation for Rugby landlords
We fit en-suite shower rooms in HMO bedrooms across Rugby, starting with a check that each bedroom still meets its size standard once the en-suite is built. Councils take different views on whether en-suite floor area counts, so we confirm the local position first.
Older houses often have joists running the wrong way and soil stacks in fixed positions, so in Rugby we check the drainage route under the floor before quoting. Every en-suite we fit in Warwickshire is finished with a ducted fan, certified electrics and fire stopping.
- Shower, toilet, basin and wipe-clean wall finish fitted
- Drainage route checked under the floor at survey
- Bedroom measured to confirm it still meets size standards
- Electrical work tested and certified
- Extract fan ducted to outside with overrun control
